Case Study Applications
- GIS Cable Entry Application
- Metro open trench cable Application
- Data Centre Cable Entry
- Powergrid Kargil Case Study
- Oil & Gas Sealing Case Study
- Nuclear Plant case study
- China Case Study
Simulating Cable Pulls in Advance can
– reduce number of joints in cable
– reduce civil & jointing cost
– eliminate cable damage during installation
– optimise cable system design / life / cost
– reduce Time required for installation
– eliminates cable jam
Cable Hauling Stories from Australia
Design Consideration in underground cable installation
reduce number of joints in cable
reduce civil & jointing cost
eliminate cable damage during installation
optimise cable system design / life / cost
reduce Time required for installation
eliminates cable jam
Power Cable Installation Practices
Lower cost of MV/HV cable installation in duct
Faster installation
Fewer cable joints/splices
Higher lifetime grid performance
Lower damage due to flooding and high winds
Lower Meantime between failure
Experiences in different parts of the world: India & Canada