Presentation Conference 2026
-
Industrializing Duct Underground Power Cable InfrastructureIndustrializing Duct Underground Power Cable Infrastructure Mr. Jacco Smith, Tennet European Transmission Co. on
-
Dynamic cable rating (DCR) for renewableDynamic cable rating (DCR) for renewable Ms. Isvereya, Windplus
-
Global Design Practices for Insulated Cable SystemGlobal Design Practices for Insulated Cable System Rohini Bhattacharya, Consultant
-
Permanent electrical and thermal monitoring of HV cable joints: Data analysis, defect localization, outage risk mitigation on a 220 kV double circuitPermanent electrical and thermal monitoring of HV cable joints: Data analysis, defect localization, outage risk mitigation on a 220 kV double circuit Dr. Philip Orr, Synaptech
-
Asset management of Cable fleetAsset management of Cable fleet Dr. Aradhana Ray, Lax Energy
-
Cable fault locationCable fault location Mr. Sanjay Mishra, SM Systems
-
Cable Maintenance activitiesCable Maintenance activities Mr. Ravindra Gawade, Tata Power Co. P.L.
-
Challenges in Power Cable laying & their maintenance in Urban CitiesChallenges in Power Cable laying & their maintenance in Urban Cities Arvind Pophale, Tata Power Co.
-
Act Before It Arcs: Importance of Timely Diagnostic Intervention in power cable asset managementAct Before It Arcs: Importance of Timely Diagnostic Intervention in power cable asset management Mr. Niraj Yadav, Thabeer
-
Failure Analysis of Solar DC String Cables - A Case StudyFailure Analysis of Solar DC String Cables - A Case Study Mr. Anil Khopkar, ERDA
-
AERIAL BUNCHED CABLES DESIGN IMPROVEMENT & method of InstallationAERIAL BUNCHED CABLES DESIGN IMPROVEMENT & method of Installation Mr. Ramaprasath, Jt Director (Retd), CPRI
-
When a Dead Cable Comes Alive: A case study on Lessons Beyond Relays, Earthing and Cable QualityWhen a Dead Cable Comes Alive: A case study on Lessons Beyond Relays, Earthing and Cable Quality Mr. B. D. Gour, ETP Earthing & LPS Solution
-
Global Best Practices in Cable InstallationGlobal Best Practices in Cable Installation Ms. Sheri Dahlke, Polywater
-
Guidelines Implemented and Roadmap Proposed for the Underground Cable Network – BRPLGuidelines Implemented and Roadmap Proposed for the Underground Cable Network – BRPL
-
HV Power cable life cycle management (11 Kv to 400 KV) JHV Power cable life cycle management (11 Kv to 400 KV) J Jignesh Patel, Parth Electricals
-
Cable Entry sealingsCable Entry sealings Amol Sandhanshiv, Leakxpert
-
Online Partial Discharge Monitoring of cablesOnline Partial Discharge Monitoring of cables Nithyananda R , Doble
-
EHV Cable projectEHV Cable project Dhiren Pandya, Tata Power
